B2 • 15mTarget: 90–140 words

Negotiating a Project Deadline with a Client

Task Prompt

Unexpected technical dependencies have emerged. You need to request a 4-day extension from a high-stakes external client without sounding incompetent or defensive. Draft an email update explaining the unexpected dependency, assuring quality control, and proposing a revised timeline.

Target Expressions0/3 used
pave the way forRequired

make it easier for future success or progress to happen

e.g. “Addressing this dependency now will pave the way for a friction-free enterprise launch.”

in light ofRequired

because of; taking into consideration new facts

e.g. “In light of our latest automated integration tests, we are recalibrating our release schedule.”

rest assured thatRequired

be completely confident and have no doubts that

e.g. “Rest assured that our core team has already mapped out the hotfix.”

Scoring Criteria Focus
  • •Objective, non-apologetic tone
  • •Actionable remediation plan explicitly mentioned
  • •Exact revised date and time specified
0
Words Written
Target: 90–140
0 paragraph(s) • 0 sentence(s)
Instant Structural Diagnostics (L1 Rules)
Word countfail

0 words: 90 below the 90-word minimum.

Target expressionsfail

0/3 target expressions used.

Linking wordsfail

No linking words detected. Use contrast / addition / result connectors.

Lexical varietyinfo

Write at least 40 words to measure vocabulary variety.

Sentence varietyinfo

Write at least 3 sentences to measure sentence variety.